New State Law Exempts Charlotte Redevelopment Projects from Stormwater Controls

State legislation passed last month at the conclusion of the 2018 session of the General Assembly means redevelopment sites in Charlotte are no longer required to include on-site stormwater controls if no additional impervious surface is created. A provision in SB 469, a Technical Corrections bill initially vetoed by Governor Cooper but ratified through a legislative override, specifically mandates the change to local stormwater ordinances, regardless of where a local government obtains its regulatory authority.

While a redevelopment exemption for stormwater has been state law for years, the City of Charlotte has previously required controls on all projects, citing its adherence to a federal NPDES stormwater permit that called for higher local standards. REBIC has long argued that stormwater controls should not be required on redevelopments where no additional impervious surface is created.

The provision in SB 469 also allows development within a vegetative buffer, as long as the runoff from the entire impervious area of the project is collected, treated, and discharged through a portion of managed vegetative buffer. Of course, stormwater controls will continue to be required on sites whenever additional impervious surface is created.

Thanks are due to the North Carolina Home Builders Association (NCHBA) and State Representative Dean Arp (R-Union) for their support of this critical legislation!

(Orginally posted on REBIC's In the Loop blog)

Share this post: